Jakimo Infrastructure Company

Yuumbu Water Project, Kitui County

Report Details
Activity Title  Yuumbu Water Project, Kitui County
Contractor(s) Jakimo Infrastructure (EA) Limited
Reported By: Lead Engineer Jacob K. Mwisyo

The transformative impact of the Yuumbu Water Project in Kitui County, spearheaded by Jakimo Infrastructure (E.A) Ltd. The project addresses a longstanding challenge for the residents—access to clean and reliable water, an essential resource that was once a distant dream for many in the region.

The Problem: Water Scarcity and Long Journeys

Before the project’s implementation, the people of Yuumbu endured a harsh reality. Access to water was a grueling endeavor, often involving treks of over 300 kilometers to fetch water. This arduous journey not only consumed precious time but also affected livelihoods, particularly for women and children, who bore the brunt of the task. The scarcity of water impeded daily life, from household needs to agriculture and livestock sustenance.

The Solution: A Vision Realized

Jakimo Infrastructure, in partnership with local stakeholders, took on the monumental task of bringing water closer to the community. The project involved the installation of modern water infrastructure designed to alleviate the burden of water scarcity. Key elements of the project included:

  • Construction of Water Pipelines: Extending from the water source to key distribution points within the community, ensuring efficient and reliable delivery of water.
  • Water Storage Facilities: Installation of large-capacity water tanks to store and distribute water sustainably.
  • Sustainable Energy Integration: Utilization of solar-powered pumps to ensure uninterrupted water supply, leveraging renewable energy to maintain efficiency.

Impact on the Community

The success of the Yuumbu Water Project has profoundly changed the lives of the residents. Key benefits highlighted in the video include:

  1. Reduced Travel Distance: Residents no longer have to endure the backbreaking 300 km journey to fetch water. With water now accessible nearby, they can dedicate more time to productive activities.

  2. Improved Health and Sanitation: The availability of clean water has significantly improved hygiene, reducing waterborne diseases and enhancing overall health standards in the community.

  3. Empowerment of Women and Children: With easier access to water, women can engage in economic activities, and children can focus on education, no longer burdened by the need to fetch water.

  4. Economic Growth: The project has spurred economic activities such as small-scale farming and livestock rearing, which were previously hampered by the lack of water.

Community Voices and Gratitude

The video captures heartfelt testimonials from the local residents who express profound gratitude for the project’s impact. They describe how the once-daunting task of securing water has become a simple, manageable part of daily life. Their stories reflect the project’s transformative power, not only in terms of physical infrastructure but also in the upliftment of their overall quality of life.

Conclusion: A Legacy of Hope

The Yuumbu Water Project stands as a testament to the power of community-focused development. By addressing a fundamental need, Jakimo Infrastructure has not only improved living conditions but also paved the way for future growth and sustainability in Kitui County. This project symbolizes hope, resilience, and the importance of investing in local communities to foster long-lasting change.

Yuumbu Water Project

The Numbers

Project Year

Water Tank Capacity

ltrs

Completion

%

Client Satisfaction

%